ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
23. |
MONTHLY WATER SUPPLY AND
CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
July 19, 2021 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|
||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for
Protection of Natural Resources. |
|||||
Exhibit 23-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of July 1, 2021. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through June 2021 totaled 0.00 inches and brings
the cumulative rainfall total for WY 2021 to 10.85 inches, which is 52%
of the long-term average through June. Estimated unimpaired runoff through June totaled 313 acre-feet (AF) and
brings the cumulative runoff total for WY 2021 to 16,134 AF, which is 24% of the long-term average through June.
Usable storage for the MRWPRS was 26,770
acre-feet, which is 89% of
average through June, and equates to
81% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 7,310 AF of water from the Carmel River in WY 2021. Through June, using the CDO accounting method, Cal-Am has produced 3,443 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2021. Through June, Cal-Am has produced 1,080 AF from the Seaside Groundwater Basin. Through June, 66 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 17 AF have been diverted under Table 13 water rights, and 2,330 AF of Pure Water Monterey recovered. Cal-Am has produced 6,873 AF for customer use from all sources through June. Exhibit 23-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
23-A Water Supply Status: July 1,
2021
23-B Monthly Cal-Am production by source: WY 2021
U:\staff\Boardpacket\2021\20210719\Informational
Items\23\Item-23.docx