ITEM: |
INFORMATION
ITEMS/STAFF REPORT |
||||
|
|||||
26. |
MONTHLY WATER
SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
November 15, 2021 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater
Basin adjudication decision, as amended and Section 15268 of the California
Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt
from Section 15307, Actions by Regulatory Agencies for Protection of Natural
Resources. |
|||||
Exhibit 26-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of November 1, 2021. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through October 2021 totaled 2.08 inches and brings
the cumulative rainfall total for WY 2022 to 2.08 inches, which is 273%
of the long-term average through October. Estimated unimpaired runoff through October totaled 451 acre-feet (AF)
and brings the cumulative runoff total for WY 2022 to 451 AF, which is 113% of the long-term average through October. Usable storage for the MRWPRS was 25,840 acre-feet, which is 92% of average through October, and equates to 76% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022. Through October, using the CDO accounting method, Cal-Am has produced 445 AF from the Carmel River (including ASR capped at 600 AF, Table 13, and Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022. Through October, Cal-Am has produced 41 AF from the Seaside Groundwater Basin. Through October, 0 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 0 AF have been diverted under Table 13 water rights, and 344 AF of Pure Water Monterey recovered. Cal-Am has produced 829 AF for customer use from all sources through September. Exhibit 26-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
26-A Water Supply Status: November
1, 2021
26-B Monthly Cal-Am production by source: WY 2021
U:\staff\Boardpacket\2021\20211115\Informational
Items\26\Item-26.docx