ITEM: |
CONSENT
CALENDAR |
||||
|
|||||
4. |
CONSIDER ADOPTION OF
RESOLUTION NO. 2021-16 TO AMEND RULE 141, TABLE XIV-1 TO UPDATE REBATE
AMOUNTS |
||||
|
|||||
Meeting
Date: |
December 13, 2021 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J.
Stoldt, |
Program/ |
|
||
|
General
Manager |
Line Item No.: |
|||
|
|||||
Prepared
By: |
Stephanie
Locke |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: The Water Demand Committee recommends approval. |
|||||
CEQA Compliance: This action does not constitute a project
as defined by the California Environmental Quality Act Guidelines section
15378. |
|||||
SUMMARY: Resolution 2021-16 (Exhibit 4-A)
updates Rule 141, Rebate Amounts Table. Two amendments to Rule 141 are proposed
in Resolution 2021-16:
1.
“Smart Controller” has
been changed to “Weather Based or Smart Irrigation Controller” for consistency
with Rule 11, Definitions.
2.
New rebate for Smart Flowmeters: Maximum rebate of $200 per Qualifying Device
(excluding taxes and installation). The rebate is limited to one device per User
on a Site. If applicable, the rebate can cover pre-paid subscription service.
Multiple rebates may be considered on a case-by-case basis through the variance
process.
RECOMMENDATION: District staff recommends that the Board adopt Resolution 2021-16, A Resolution of the Board of Directors of the Monterey Peninsula Water Management District Amending Table XIV-1, Rebate Amounts. This item will be approved if adopted along with the Consent Calendar.
BACKGROUND: Ordinance No. 163,
adopted March 16, 2015, allows changes to the Rebate Amounts Table by
resolution rather than by ordinance. The
Rebate Amounts Table was last updated on June 21, 2021, by adoption of Resolution
2021-09.
U:\staff\Boardpacket\2021\20211213\Consent
Calendar\04\Item-4.docx