ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
29. |
MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION
REPORT |
||||
|
|||||
Meeting Date: |
February 24, 2022 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater
Basin adjudication decision, as amended and Section 15268 of the California
Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt
from Section 15307, Actions by Regulatory Agencies for Protection of Natural
Resources. |
|||||
Exhibit 29-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of February 1, 2022. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through January 2021 totaled 0.04 inches and brings
the cumulative rainfall total for WY 2022 to 9.56 inches, which is 86%
of the long-term average through January. Estimated unimpaired runoff through January totaled 4,745 acre-feet (AF)
and brings the cumulative runoff total for WY 2022 to 17,901 AF, which is 86% of the long-term average through January. Usable storage for the MRWPRS was 29,960 acre-feet, which is 96% of average through January, and equates to 87% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022. Through January, using the CDO accounting method, Cal-Am has produced 1,628 AF from the Carmel River (including ASR capped at 600 AF in, Table 13, and Mal Paso in Calendar Year 2021.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022. Through January, Cal-Am has produced 163 AF from the Seaside Groundwater Basin. Through January, 71 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 68 AF have been diverted under Table 13 water rights, and 1,041 AF of Pure Water Monterey recovered. Cal-Am has produced 2,806 AF for customer use from all sources through January. Exhibit 29-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
29-A Water Supply Status: February
1, 2022
29-B Monthly Cal-Am production by source: WY 2022
U:\staff\Boardpacket\2022\20220224\Informational
Items\29\Item-29.docx