ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
23. |
MONTHLY WATER
SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
May 16, 2022 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for
Protection of Natural Resources. |
|||||
Exhibit 23-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of May 1, 2022. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through April 2022 totaled 1.15 inches and brings
the cumulative rainfall total for WY 2022 to 12.80 inches, which is 63%
of the long-term average through April. Estimated unimpaired runoff through April totaled 1,312 acre-feet (AF)
and brings the cumulative runoff total for WY 2022 to 21.510 AF, which is 35% of the long-term average through April.
Usable storage for the MRWPRS was 29.160
acre-feet, which is 92% of
average through April, and equates
to 88% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022. Through April, using the CDO accounting method, Cal-Am has produced 2,362 AF from the Carmel River (including ASR capped at 600 AF in, Table 13, and Mal Paso in Calendar Year 2022.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022. Through April, Cal-Am has produced 381 AF from the Seaside Groundwater Basin. Through April, 71 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 68 AF have been diverted under Table 13 water rights, and 2,259 AF of Pure Water Monterey recovered. Cal-Am has produced 5,017 for customer use from all sources through April. Exhibit 23-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
23-A Water Supply Status: May 1,
2022
23-B Monthly Cal-Am production by source: WY 2022
U:\staff\Boardpacket\2022\20220516\Informational
Items\23\Item-23.docx