ITEM: |
INFORMATIONAL ITEM/STAFF
REPORT |
||||
|
|||||
17. |
MONTHLY WATER
SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
August 15, 2022 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater
Basin adjudication decision, as amended and Section 15268 of the California
Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt
from Section 15307, Actions by Regulatory Agencies for Protection of Natural
Resources. |
|||||
Exhibit 17-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of August 1, 2022. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through July 2022 totaled 0.01 inches and brings
the cumulative rainfall total for WY 2022 to 12.83 inches, which is 61%
of the long-term average through July. Estimated unimpaired runoff through July totaled 262 acre-feet (AF) and
brings the cumulative runoff total for WY 2022 to 22,894 AF, which is 34% of the long-term average through July.
Usable storage for the MRWPRS was 27,350
acre-feet, which is 92% of
average through July, and equates to
83% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022. Through July, using the CDO accounting method, Cal-Am has produced 3,403 AF from the Carmel River (including ASR capped at 600 AF in, Table 13, and Mal Paso in Calendar Year 2022.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022. Through July, Cal-Am has produced 1,149 AF from the Seaside Groundwater Basin. Through July, 71 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 68 AF have been diverted under Table 13 water rights, and 3,132 AF of Pure Water Monterey recovered. Cal-Am has produced 7,729 AF for customer use from all sources through July. Exhibit 17-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
17-A Water Supply Status: August
1, 2022
17-B Monthly Cal-Am production by source: WY 2022