ITEM:

INFORMATIONAL ITEMS/STAFF REPORT

 

30.

MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT

 

Meeting Date:

September 19, 2022

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 30-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of September 1, 2022.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 30-A is for Water Year (WY) 2022 and focuses on three factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status:  Rainfall through August 2022 totaled 0.00 inches and brings the cumulative rainfall total for WY 2022 to 12.83 inches, which is 61% of the long-term average through August.  Estimated unimpaired runoff through August totaled 0 acre-feet (AF) and brings the cumulative runoff total for WY 2022 to 22,894 AF, which is 34% of the long-term average through July.  Usable storage for the MRWPRS was 26,450 acre-feet, which is 92% of average through July, and equates to 80% percent of system capacity. 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022.  Through August, using the CDO accounting method, Cal-Am has produced 3,808 AF from the Carmel River (including ASR capped at 600 AF in, Table 13, and Mal Paso in Calendar Year 2022.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022.  Through August, Cal-Am has produced 1,427 AF from the Seaside Groundwater Basin.  Through August, 71 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 68 AF have been diverted under Table 13 water rights, and 3,132 AF of Pure Water Monterey recovered.  Cal-Am has produced 7,729 AF for customer use from all sources through August.  Exhibit 30-B shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.  

 

EXHIBITS

30-A    Water Supply Status: September 1, 2022

30-B    Monthly Cal-Am production by source: WY 2022

 

U:\staff\Boardpacket\2022\20220919\Informational Items\30\Item-30.docx