ITEM:

INFORMATIONAL ITEM/STAFF REPORT

 

14.

MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT

 

Meeting Date:

October 17, 2022

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 14-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of October 1, 2022.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 14-A is for Water Year (WY) 2022 and focuses on three factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status:  Rainfall through September 2022 totaled 0.40 inches and brings the cumulative rainfall total for WY 2022 to 13.23 inches, which is 63% of the long-term average through September.  Estimated unimpaired runoff through September totaled 0 acre-feet (AF) and brings the cumulative runoff total for WY 2022 to 22,894 AF, which is 34% of the long-term average through September.  Usable storage for the MRWPRS was 25,740 acre-feet, which is 92% of average through September, and equates to 78% percent of system capacity. 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 4,110 AF of water from the Carmel River in WY 2022.  Through September, using the CDO accounting method, Cal-Am has produced 4,085 AF from the Carmel River (including ASR capped at 600 AF in, Table 13, and Mal Paso in Calendar Year 2022.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2022.  Through September, Cal-Am has produced 1,651 AF from the Seaside Groundwater Basin.  Through September, 71 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 68 AF have been diverted under Table 13 water rights, and 3,683 AF of Pure Water Monterey recovered.  Cal-Am has produced 9,516 AF for customer use from all sources through September.  Exhibit 14-B shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.  

 

EXHIBITS

14-A    Water Supply Status: October 1, 2022

14-B    Monthly Cal-Am production by source: WY 2022

 

U:\staff\Boardpacket\2022\20221017\Informational Items\14\Item-14.docx