INFORMATIONAL ITEM/STAFF REPORT

 

25.

MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT

 

Meeting Date:

November 14, 2022

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 25-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of November 1, 2022.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 25-A is for Water Year (WY) 2023 and focuses on three factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status:  Rainfall through October 2022 totaled 0.00 inches and brings the cumulative rainfall total for WY 2023 to 0.00 inches, which is 0% of the long-term average through October.  Estimated unimpaired runoff through October totaled 0 acre-feet (AF) and brings the cumulative runoff total for WY 2023 to 0 AF, which is 0% of the long-term average through October.  Usable storage for the MRWPRS was 25,180 acre-feet, which is 92% of average through October, and equates to 76% percent of system capacity. 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2023.  Through October, using the CDO accounting method, Cal-Am has produced 269 AF from the Carmel River (excluding 0 AF of Table 13 and 7 AF of Mal Paso.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2023.  Through October, Cal-Am has produced 105 AF from the Seaside Groundwater Basin.  Through October, 0 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 0 AF have been diverted under Table 13 water rights, and 405 AF of Pure Water Monterey recovered.  Cal-Am has produced 805 AF for customer use from all sources through October.  Exhibit 25-B shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.  

 