ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
24. |
MONTHLY WATER
SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
February 13, 2023
|
Budgeted:
|
N/A
|
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel
Review: N/A
|
|||||
Committee
Recommendation: N/A
|
|||||
CEQA
Compliance: Exempt from environmental review
per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater
Basin adjudication decision, as amended and Section 15268 of the California
Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt
from Section 15307, Actions by Regulatory Agencies for Protection of Natural
Resources. |
|||||
Exhibit 24-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of February 1, 2023. This system includes the surface water
resources in the
Water Supply Status:
Rainfall through January 2023
totaled 12.6 inches and
brings the cumulative rainfall total for WY 2023 to 23.7 inches, which is 211%
of the long-term average through January. Estimated unimpaired runoff through January totaled 84,820 acre-feet
(AF) and brings the cumulative runoff total for WY 2023 to 91,512 AF, which is 450%
of the long-term average through January. Usable storage for the MRWPRS was 32,890 acre-feet, which is 106% of average through January, and equates to 99% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2023. Through January, using the CDO accounting method, Cal-Am has produced 792 AF from the Carmel River (excluding 121 AF of Table 13 and 31 AF of Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2023. Through January, Cal-Am has produced 316 AF from the Seaside Groundwater Basin. Through January, 282 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 121 AF have been diverted under Table 13 water rights, and 1,438 AF of Pure Water Monterey recovered. Cal-Am has produced 2,768 AF for customer use from all sources through January. Exhibit 24-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
24-A Water Supply Status: February
1, 2023
24-B Monthly Cal-Am production by source: WY 2023
U:\staff\Boardpacket\2023\20230213\Informational
Items\24\Item-24.docx