ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
23. |
QUARTERLY CARMEL RIVER RIPARIAN CORRIDOR
MANAGEMENT PROGRAM REPORT |
||||
|
|||||
Meeting Date: |
April 17, 2023 |
Budgeted: |
N/A |
||
|
|||||
From: |
Dave Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Thomas Christensen |
Cost Estimate: |
N/A |
||
|
|
|
|
||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: This action does not
constitute a project as defined by the California Environmental Quality Act
Guidelines section 15378. |
|||||
IRRIGATION
OF RIPARIAN VEGETATION: Irrigation of riparian vegetation has been on
hold because of sufficient rainfall.
Water
Use in Acre-Feet (AF) |
|
January
- March 2023 |
0.00 AF |
Year-to-date |
0.00 AF |
MONITORING
OF RIPARIAN VEGETATION: During the winter season, the District
suspended the riparian vegetation monitoring program. The monitoring of soil moisture, groundwater
levels, and canopy defoliation (a measure of vegetation moisture stress) will
resume in June 2023. During the months
of June through October, staff will take monthly measurements of depth to
groundwater and canopy vigor in areas where willow and cottonwood trees may be
impacted by lowered water levels caused by groundwater extraction. The areas monitored are in the vicinity of
California American Water’s (Cal-Am) Cañada and San Carlos wells, and the
District’s Valley Hills (next to Cal-Am’s Cypress Well) and Schulte (next to
Cal-Am’s Schulte Well) Restoration Projects.
The District’s monitoring provides insight into the status of soil
moisture through the riparian corridor by collecting and analyzing monthly
readings from the District’s array of monitoring wells and pumping records for
large-capacity Carmel Valley wells in the Cal-Am system.
OTHER
TASKS PERFORMED SINCE THE JANUARY 2023 QUARTERLY REPORT:
1.
Los Padres
Alternatives Study: District staff have
participated in multiple Technical Review Committee (TRC) meetings with Cal-Am,
AECOM, National Marine Fisheries Service, and California Department of Wildlife
with regards to the Los Padres Reservoir Alternatives Study. This study is
evaluating Los Padres Reservoir including alternatives such as: reservoir
dredging, dam removal, and volitional fish passage. AECOM has recently
circulated the revised Draft Final Report (Los Padres Dam and Reservoir
Alternatives and Sediment Management Study) for the TRC to review. The final
report is scheduled to be released in April 2023.
2.
Sleepy Hollow Steelhead Rearing Facility (SHSRF): District staff have been inspecting recent
construction activities at the SHSRF. Tyman Construction is currently putting
the finishing touches on repairs to the rearing channel including concrete
work, liner replacement, and drainage improvements.
3. Steelhead Permit Reporting
Requirements:
The District has been uploading steelhead rescue data from last year’s
steelhead rescue season to state and federal databases. This reporting is
required to keep the District’s Scientific Collecting Permit valid as well as
help regulators understand the current state of steelhead on the Carmel River.
U:\staff\Boardpacket\2023\20230417\Informational
Items\23\Item-23.docx