ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
23. |
MONTHLY WATER SUPPLY AND |
||||
|
|||||
Meeting Date: |
May 15, 2023 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater
Basin adjudication decision, as amended and Section 15268 of the California
Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt
from Section 15307, Actions by Regulatory Agencies for Protection of Natural
Resources. |
|||||
Exhibit 23-A shows the water
supply status for the Monterey Peninsula Water Resources System (MPWRS) as of May 1, 2023. This system includes the surface water
resources in the
Water Supply Status: Rainfall
through April 2023 totaled 0.15 inches and brings
the cumulative rainfall total for WY 2023 to 34.61 inches, which is 169%
of the long-term average through April. Estimated unimpaired runoff through April totaled 23,390 acre-feet (AF)
and brings the cumulative runoff total for WY 2023 to 197.092 AF, which is
314% of the long-term average through
April. Usable storage for the MRWPRS was 32,080 acre-feet, which is 102% of average through April, and equates to 102% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2023. Through April, using the CDO accounting method, Cal-Am has produced 894 AF from the Carmel River (excluding 410 AF of Table 13 and 53 AF of Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2023. Through April, Cal-Am has produced 812 AF from the Seaside Groundwater Basin. Through April, 1,250 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 410 AF have been diverted under Table 13 water rights, and 2,675 AF of Pure Water Monterey recovered. Cal-Am has produced 4,936 AF for customer use from all sources through April. Exhibit 23-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
23-A Water Supply Status: May 1,
2023
23-B Monthly Cal-Am production by source: WY 2023
U:\staff\Boardpacket\2023\20230515\Informational
Items\23\Item-23.docx