MONTHLY WATER SUPPLY AND
CALIFORNIA AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
June 20, 2023 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA
Compliance: Exempt from environmental
review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin
Groundwater Basin adjudication decision, as amended and Section 15268 of the
California Environmental Quality Act (CEQA) Guidelines, as a ministerial
project; Exempt from Section 15307, Actions by Regulatory Agencies for
Protection of Natural Resources. |
|||||
Exhibit 38-A shows the water supply status for the Monterey
Peninsula Water Resources System (MPWRS) as of June 1, 2023. This system
includes the surface water resources in the
Water Supply Status: Rainfall
through May 2023 totaled 0.41 inches and brings
the cumulative rainfall total for WY 2023 to 35.02 inches, which is 168%
of the long-term average through May. Estimated unimpaired runoff through May totaled 7,040 acre-feet (AF)
and brings the cumulative runoff total for WY 2023 to 204,132 AF, which is
308% of the long-term average through
May.
Usable storage for the MRWPRS was 31,750
acre-feet, which is 101% of
average through May, and equates to 96% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2023. Through May, using the CDO accounting method, Cal-Am has produced 914 AF from the Carmel River (excluding 511 AF of Table 13 and 65 AF of Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2023. Through May, Cal-Am has produced 1,387 AF from the Seaside Groundwater Basin. Through May, 1,656 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 511 AF have been diverted under Table 13 water rights, and 2,675 AF of Pure Water Monterey recovered. Cal-Am has produced 5,657 AF for customer use from all sources through May. Exhibit 38-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.