ITEM:

ACTION ITEM

 

13.

Consider Approval of an Addendum to the Pure Water Monterey Supplemental Environmental Impact Report for the District’s Water Allocation Program

 

Meeting Date:

February 12, 2024

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

35-01-786040

 

General Manager

Line Item No.: 

 

 

Prepared By:

David J. Stoldt

Cost Estimate: 

N/A

 

General Counsel Review:  N/A

Committee Recommendation:  N/A

CEQA Compliance:  This action does not constitute a project as defined by the California

Environmental Quality Act Guidelines Section 15378.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMARY:  Construction of the Pure Water Monterey (PWM) Expansion project is expected to be completed in late 2025. The PWM Expansion is expected to bring the permanent replacement water supply that will enable the lifting of the cease and desist order (CDO) and the moratorium on the setting of new meters, if Cal-Am, the District, and the State Water Board all cooperate.

 

The new supply over and above existing demand will be allocated to local jurisdictions through a process led by the District, involving first the Technical Advisory Committee, and then ultimately the Policy Advisory Committee (the Allocation Process.)

 

In August 2023, the Board received a technical memorandum from Rincon Consultants on the appropriate environmental action for the Allocation Process. The Technical Memorandum concluded (a) that the proposed water allocation qualifies as a project under CEQA because it is being undertaken by a public agency and has the potential for reasonably foreseeable indirect physical changes in the environment, such as facilitating land development through the provision of increased water supplies. In other words, the additional water that would be available to jurisdictions in the District’s service area could facilitate development that would have otherwise been impossible due to lack of water availability; and (b) the document review determined that the Pure Water Monterey Supplemental EIR, certified April 2021, SCH No. 2013051094 (2021 SEIR) had already analyzed the growth-inducing and secondary environmental effects associated with the proposed water allocation, which is, in practice, a continuation of the District’s existing water allocation program. Based on those findings, Rincon recommended preparation of Addendum No. 2 to the 2021 SEIR.

 

The analysis pursuant to CEQA Guidelines Section 15162 demonstrates whether the lead agency can approve the activity as being within the scope of the existing certified 2021 SEIR, that an addendum to the existing SEIR would be appropriate, and no new environmental document, such as a new EIR, would be required. The addendum need not be circulated for public review but can be included in or attached to the 2021 SEIR, and the decision-making body shall consider the addendum with the 2021 SEIR prior to deciding on the project. The 2021 SEIR can be found here:

https://purewatermonterey.org/wp/wp-content/uploads/Final-SEIR-Proposed-Modifications-PWM-GWR-Project-April-2020.pdf

 

The District has prepared the EIR Addendum, attached as Exhibit 13-A, pursuant to CEQA Guidelines Sections 15162 and 15164, to evaluate whether the project’s environmental impacts are covered by and within the scope of the 2021 SEIR for the Expanded PWM/GWR Project. This Addendum details any changes in the project, changes in circumstances under which the project is undertaken, and/or "new information of substantial importance" that may cause one or more effects to environmental resources.

 

The responses therein substantiate and support the District’s determination that the additional water allocation is within the scope of the 2021 SEIR, does not require subsequent action under CEQA Guidelines Section 15162 and, in conjunction with the 2021 SEIR, adequately analyzes potential environmental impacts.

 

RECOMMENDATION:  The General Manager recommends that the Board consider and approve the Addendum, in conjunction with the 2021 SEIR, and find that there is substantial evidence that there will be no new significant impacts and none of the conditions described in Section 15162 of the CEQA Guidelines calling for preparation of a subsequent EIR have occurred.

 

EXHIBIT

13-A    Addendum to the Pure Water Monterey Expansion 2021 SEIR

 

U:\staff\Boardpacket\2024\02122024\Action Items\13\Item-13.docx