INFORMATIONAL ITEM/STAFF REPORT

 

21.

MONTHLY WATER SUPPLY AND CALIFORNIA AMERICAN WATER PRODUCTION REPORT

 

Meeting Date:

October 21, 2024

Budgeted: 

N/A

 

From:

David J. Stoldt,

Program/

N/A

 

General Manager

Line Item No.:

 

 

 

Prepared By:

Jonathan Lear

Cost Estimate:

N/A

 

General Counsel Review:  N/A

Committee Recommendation: N/A

CEQA Compliance: Exempt from environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the Seaside Basin Groundwater Basin adjudication decision, as amended and Section 15268 of the California Environmental Quality Act (CEQA) Guidelines, as a ministerial project; Exempt from Section 15307, Actions by Regulatory Agencies for Protection of Natural Resources.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Exhibit 21-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of October 1, 2024.  This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin.  Exhibit 21-A is for Water Year (WY) 2024 and focuses on three factors: rainfall, runoff, and storage.  The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir. 

 

Water Supply Status: Rainfall through September 2024 totaled 0.00 inches and brings the cumulative rainfall total for WY 2024 to 24.17 inches, which is 114% of the long-term average through September.  Estimated unimpaired runoff through September totaled 641 acre-feet (AF) and brings the cumulative runoff total for WY 2024 to 83,879 AF, which is 122% of the long-term average through September.  Usable storage for the MRWPRS was 26,890 acre-feet, which is 96% of average through September, and equates to 81% percent of system capacity. 

 

Production Compliance:  Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2024.  Through September, using the CDO accounting method, Cal-Am has produced 3,347 AF from the Carmel River (excluding 410 AF of Table 13 and 73 AF of Mal Paso.)  In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2024.  Through September, Cal-Am has produced 1,545 AF from the Seaside Groundwater Basin.  Through September, 1,519 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 410 AF have been diverted under Table 13 water rights, and 3,355 AF of Pure Water Monterey recovered.  Cal-Am has produced 8,972 AF for customer use from all sources through September.  Exhibit 21-B shows production by source.  Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data. 

 