ITEM: |
ADMINISTRATIVE COMMITTEE |
||||
|
|||||
1. |
Consider
Expenditure of Budgeted Funds to Amend Contract with |
||||
|
|||||
Meeting Date: |
November 10, 2008 |
Budgeted: |
Yes |
||
|
|||||
From: |
|
Program/ |
1-2-1 A. 1, 2, 4 |
||
|
General Manager |
Line Item No.: |
and 6 |
||
|
|||||
Prepared By: |
|
Cost Estimate: |
$649,433 |
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee Recommendation: |
|||||
CEQA Compliance: N/A |
|||||
SUMMARY:
As part of the Monterey Peninsula Water Management District (MPWMD or
District) Phase 1 Aquifer Storage and Recovery (ASR) Project, a second
injection well was constructed in 2007.
This well, known as ASR #2, is currently in the process of being
equipped for injection and recovery testing operations. In 2008, permanent underground utility lines
(i.e., water, electrical, chemical) were installed, and preliminary site
grading was conducted. The District is
now preparing to embark on the final phase of completion for the Phase 1 ASR
site, which will include:
(a) structural and architectural designs
for the onsite permanent electrical/chemical treatment building,
(b) plans and specifications for the
Pacific Gas and Electric (PG&E) upgrade service to the site,
(c) plans and specifications for
permanent site grading, paving, fencing and landscaping,
(d) permitting assistance with the City
of
(e) permitting assistance with the
Regional Water Quality Control Board,
(f) contractor bidding assistance for
construction of remaining Phase 1 site facilities,
(g) construction management services for
remaining Phase 1 site facilities,
(h) assistance with Water Year 2009 ASR
operations,
(i) assistance with anticipated Phase 2
ASR expansion planning.
Accordingly, District staff has requested
and received a proposal for this assistance from Pueblo Water Resources (PWR),
the firm that has been providing hydrogeologic and engineering technical
assistance on the Phase 1 ASR project.
The PWR proposal is provided as Exhibit 1-A and describes these tasks in
greater detail. The proposal includes a
schedule for work through the end of Fiscal Year 2008-09 (i.e., June 30, 2009),
when it is anticipated that the required facilities will be at or near
completion. This is an aggressive
schedule, but is desired in order to have all the site permanent facilities in
place for the anticipated project operations with the expanded delivery
capacity (i.e., 3,000 gallons per minute injection capacity) from the
California American Water (CAW) delivery system by December 2009.
RECOMMENDATION:
District staff recommends authorization to amend the existing contract
agreement with PWR for the hydrogeologic and engineering technical services
described in Exhibit
1-A, for a not-to-exceed amount of $649,433. If approved, staff will process an amendment
for this amount in order to initiate this work.
1-A PWR Proposal for Professional Hydrogeologic and
Engineering Services, letter of November 6, 2008
U:\staff\word\committees\Admin\2008\20081110\01\item1.doc