CONSIDER Expenditure of Funds for the Maintenance and
Repair of the Rearing Channel Liner at the Sleepy Hollow Steelhead Rearing
Facility |
|||
|
||||
Meeting
Date: |
February
10, 2021 |
Budgeted: |
No |
|
|
||||
From: |
David J. Stoldt, General Manager |
Program/ |
Protect
Environmental Quality
|
|
|
|
Line Item
No.: |
2-3-1 A General operations and maintenance |
|
|
||||
Prepared
By: |
Beverly
Chaney and Larry
Hampson |
Cost
Estimate: |
$13,363 |
|
|
||||
General
Counsel Review: N/A |
||||
Committee
Recommendation: The Administrative
Committee reviewed this item on February 10, 2021 and recommended ____________. |
||||
CEQA Compliance: Categorical Exemption, Section 15301,
Existing Facilities. |
||||
SUMMARY: Staff proposes to hire Scardina Builders, Inc.
to repair a portion of the liner used in the rearing channel at the Sleepy
Hollow Steelhead Rearing Facility. The
cost of repair is estimated to be $12,363 (see Exhibit 2-A). District
staff would like to include a $1,000 contingency for this project. Work must be
completed prior to the initiation of 2021 operations and should take
approximately one week. Because the
needed repair work was discovered after the adoption of the FY 2020-2021 budget
in June 2020, the General operations and maintenance line item should be
increased with the mid-year budget adjustment.
RECOMMENDATION: The Administrative Committee should recommend
that the Board of Directors approve the following actions:
A) Authorize repairs
at a Not-to-Exceed cost of $13,363; and
B) Authorize a
mid-year budget adjustment of $13,363 in line item 2-3-1 A. General operations
and maintenance for the Sleepy Hollow Steelhead Rearing Facility.
DISCUSSION: The Sleepy Hollow Steelhead Rearing Facility was
recently upgraded to allow for expanded use of the facility and was operated
for several months in 2020. However, no
repairs were made to the original 800 feet of liner in the rearing channel
during the upgrade project. In the past
when there was evidence of minor leaks in the liner, staff have carried out
repairs. Operations during 2020 showed
that the liner, which was installed in 1996 and is made of Hypalon, has
deteriorated to the point that there are water leaks out of the channel through
the bottom and sides at several locations.
The location proposed for repairs is one of the largest leaks along the
channel and could cause loss of support material for the liner and concrete
walls. The liner has been repaired
previously but must now be replaced in this section and the new section joined
to the adjacent upstream section. Staff has worked with Scardina Builders,
Inc., on several other maintenance projects at the facility.
IMPACTS ON STAFF AND RESOURCES: Funds for repairs will be included in the FY
2020-2021 mid-year budget adjustment under Program line item 2-3-1 A. General operations
and maintenance.