EXHIBIT 3-A
4-29-13 DRAFT
GWR Criteria
(Amended per MPWSP Governance Committee Discussion
4-22-13
And MPRWA Technical Advisory Committee Discussion
4-15-13)
1.
Complete
and certify EIR for GWR at CEQA+ level.
2.
Water
rights secured for recommended project.
3.
Low
end of the range of estimates of revenue requirement for GWR plus 6.4 MGD
desalination plant shall be less than or equal to the high end of the range of
estimates of revenue requirement for 9.6 MGD desalination plant (alternately:
within XX% of)
4.
Costs/benefits
of environmental and policy “externalities” identified and included in
evaluation.
5.
At
a point that is (i) no earlier than the date Cal-Am accepts the 30% Design from
the contractor retained for the design of the Desalination Infrastructure, and
(ii) no later than that date upon which Cal-Am is prepared to issue a notice to
proceed to a contractor to commence construction of the Desalination
Infrastructure, the time estimate for GWR project start-up is no later than the
then current desal project start-up estimated date. (alternatively: SWRCB has signaled acceptance of later
project start-up date for GWR)
6.
Permit
status is consistent with the project schedule.
7.
Level
of comfort with CDPH as to the treatment process, injection, and overall
permitting
8.
Completion
of preliminary design.
9.
Project
funding plan in place.
10.
Draft
water purchase agreement approved.
U:\staff\Board_Committees\WSP\2013\20130502\03\item3_exh3a.docx