PERFORMANCE
MEASURES SUMMARY
WATER
RESOURCES DIVISION
Program Category |
Performance Measure |
Measurement
Intent |
FY 2003-04 Performance |
FY 2004-05 Performance
* |
FY 2005-06 Target |
Water Supply |
ASR EIR |
Complete draft EIR deliverables by target dates set in Tm. Supply schedule |
NA |
On target |
On target |
Water Supply |
SWRCB ASR permit reporting |
Reports complete by SWRCB-requested timeline |
On target |
On target |
On target |
Water Supply |
Surface flow monitoring |
Collect and process streamflow data from 15 gaging stations within schedule for District reports |
100% |
100% |
100% |
Water Supply |
Groundwater level monitoring |
Collect ground water level data by monthly and quarterly end dates to support MPWMD reports |
100% |
90% |
100% |
Environmental Protection |
Steelhead rescues |
Rescue steelhead from drying reaches of river, with goal of 5% or less mortality |
On target (<5%) |
On target (<5%) |
On target |
Environmental Protection |
Steelhead rearing |
Rear steelhead at Sleepy Hollow Facility, with goal of 40% or greater survival |
On target (44%) |
On target (42%) |
On target |
Environmental Protection |
Lagoon vegetation monitoring |
Conduct annual vegetation transects and bathymetric surveys, with goal of 100% annual coverage |
100% |
100% |
100% |
Water Resources Management |
Carmel River tri-party MOU |
Develop MOU between MPWMD, CDFG and Cal-Am on CR low flows and bring to Board for approval by May |
2-month delay |
On target |
On target |
Water Resources Management |
Seaside Basin Ground Water Management Plan |
Conduct all required meetings and prepare documents within timelines as per State guidelines |
100% |
100% |
100% |
Water Resources Management |
CPUC rate cases |
Prepare testimony and participate in hearings as per CPUC schedules |
NA |
On target |
On target |
Water Use & Permitting |
Annual Well Production Reporting |
Collect, analyze and report data, bring report to Board by February |
1-month delay |
1-month delay |
On target |
* Actual performance through December 2004