PERFORMANCE MEASURES SUMMARY

 

WATER RESOURCES DIVISION

 

 

Program

Category

Performance

Measure

Measurement Intent

FY 2004-05

Actual

FY 2005-06

*Estimated

FY 2006-07

Target

Water Supply

 

ASR EIR/EA

 

 

Complete EIR/EA deliverables by target dates set in Tm. Supply schedule

 

1 mo. delay

 

3 mo. delay

 

Meet targets

Water Supply

 

SWRCB ASR permit reporting

 

 

Reports complete by SWRCB-requested timeline

100%

100%

On time

Water Supply

 

Surface flow monitoring

 

Collect and process streamflow data from 15 gaging stations within schedule for District reports

100%

100%

100%

Water Supply

 

Groundwater level monitoring

 

Collect ground water level data by monthly and quarterly end dates to support MPWMD reports

90%

90%

100%

Environmental Protection

 

Steelhead rescues

 

Rescue steelhead from drying reaches of river, with goal of 5% or less mortality

On goal

(<5%)

On goal

(<1%)

Meet goal

Environmental Protection

Steelhead rearing

Rear steelhead at Sleepy Hollow Facility, with goal of 40% or greater survival

On goal

(42%)

On goal

(57%)

Meet goal

Environmental Protection

Lagoon vegetation monitoring

Conduct annual vegetation transects and bathymetric surveys, with goal of 100% annual coverage

100%

100%

Meet goal

Water Resources Management

Carmel River tri-party MOU

Develop MOU between MPWMD, CDFG and Cal-Am on CR low flows and bring to Board for approval by May target date

2 mo. delay

1 mo. delay

On target

Water Resources Management

 

Seaside Basin Ground Water Management

 

Participate in all required meetings and prepare documents within target timelines as per State guidelines (beginning March 2006: as per Watermaster directives)

100%

100%

On target

Water Resources Management

CPUC rate cases

Prepare materials (inquires, testimony, etc.) by target timelines and participate in hearings as per CPUC schedules

NA

100%

On target

Water Use & Permitting

Annual Well Production Reporting

Collect, analyze and report data, bring report to Board by February

1 mo. delay

2 mo. delay

On target

* Actual performance through April 2006