WATER MANAGEMENT
DISTRICT 2005-2006
ANNUAL REPORT (July 1,
2005 - June 30, 2006) for the MPWMD
MITIGATION PROGRAM A report in compliance
with the MPWMD WATER ALLOCATION
PROGRAM FINAL ENVIRONMENTAL
IMPACT REPORT (originally certified
in November 1990) Prepared by MPWMD
Staff March 2008 |
TABLE OF CONTENTS
SECTION PAGE
I. Introduction and Executive Summary................................................................... I-1
II. Monitor Water Resources.................................................................................. II-1
III. Manage Water Production................................................................................ III-1
IV. Manage Water Demand.................................................................................... IV-1
V. Monitor Water Usage........................................................................................ V-1
VI. Augment Water Supply..................................................................................... VI-1
VII. Allocation of New Water Supply..................................................................... VII-1
VIII. Determine Drought Reserve............................................................................ VIII-1
IX. Steelhead Fishery Mitigation Measures
............................................................. IX-1
X. Riparian Habitat Mitigation Measures................................................................. X-1
XI. Lagoon Habitat Mitigation Measures................................................................. XI-1
XII. Aesthetic Mitigation Measures......................................................................... XII-1
XIII. Summary of Program Costs (July 2005-June
2006)........................................ XIII-1
XIV. References .................................................................................................... XIV-1
LIST OF TABLES
TABLE PAGE
I-1 Summary of Mitigation Program Components.................................................... I-14
I-2 Mitigation Program Accomplishments in 2005-2006.......................................... I-16
II-1 Carmel River Basin Annual Streamflow Summary,
1992-2006 ......................... II-29
II-2 Carmel River Lagoon Water Quality Data, RY
2005-2006 .............................. II-30
II-3 Sleepy Hollow Weir Water Quality Data, RY
2005-2006................................. II-31
II-4 Below Los Padres Dam Water Quality Data, RY
2005-2006........................... II-31
III-1 Water Production Summary for WY 2005........................................................ III-7
III-2 Water Production Summary for WY 2006........................................................ III-8
IV-1 CAW Permits Issued by MPWMD in Fiscal Year
2005-06.............................. IV-6
V-1 Allocation Limit vs. Water Production (WY 2005
and WY 2006)...................... V-4
VII-1 Status of Water Allocations as of June 30,
2006 ............................................. VII-2
IX-1 Juvenile Steelhead Rescued by Category, RY
2005-06................................... IX-20
IX-2 Fish Survival at Sleepy Hollow Facility, July
2005-March 2006....................... IX-21
IX-3 Sleepy Hollow Facility Fish Release Location
Summary................................... IX-22
IX-4 Juvenile Steelhead Population Density at Survey
Stations (1990-2005)............ IX-23
X-1
Riparian Species Planted, July 2005-June 2006................................................ X-13
X-2
Monthly Water Use for Irrigation in RY 2005-06............................................. X-14
XIII-1 Summary of Mitigation Program Costs (July
2005-June 2006)........................ XIII-2
LIST OF
FIGURES
FIGURE PAGE
II-1 Daily Rainfall at San Clemente Dam, WY 2006
............................................... II-14
II-2 Monthly Distribution of Rainfall at San
Clemente Dam....................................... II-15
II-3 Principal Streamflow Measuring Stations in
Carmel River Basin......................... II-16
II-4 Cumulative Unimpaired Runoff, Carmel River
at San Clemente Dam................. II-17
II-5 End-of-Month Storage for Water Resources
System, 2005-2006 .................... II-18
II-6 Example 1: Groundwater Level Relationship to
Streamflow............................... II-19
II-7 Example 2: Groundwater Level Relationship to
Streamflow............................... II-20
II-8 Examples of Water Level Monitoring in
Seaside Basin...................................... II-21
II-9 Examples of Water Quality Monitoring in
Carmel Valley................................... II-22
II-10 Locations of Water Temperature Measurement
Stations.................................... II-23
II-11 Water Temperature Data at Carmel River
Lagoon, RY 2005-06 ...................... II-24
II-12 Water Temperature Data at Below Narrows
Site, RY 2005-06 ....................... II-24
II-13 Water Temperature Data at Garland Park
Site, RY 2005-06 ........................... II-25
II-14 Water Temperature Data Recorded at Sleepy
Hollow Weir, RY 05-06 ........... II-25
II-15 Water Temperature Data Above San Clemente
Dam, RY 2005-06.................. II-26
II-16 Water Temperature Data Below Los Padres
Dam, RY 2005-06....................... II-26
II-17 Water Temperature Data Above Los Padres
Dam, RY 2005-06...................... II-27
II-18 Carmel River Lagoon Water Surface
Elevations, December 2005..................... II-28
III-1 CAW and Non-CAW Production v. MPWMD
Allocation Limits...................... III-6
V-1 CAW Water Use Per Connection, 1980-2006................................................... V-5
IX-1 Streamflow at Highway 1 Bridge and Lagoon
Surface Elevation....................... IX-13
IX-2 Steelhead Smolts Rescued from Carmel River
Basin (1989-2005)................... IX-14
IX-3 Steelhead Juveniles Rescued in Carmel River
Basin (1989-2005).................... IX-15
IX-4 Daily Count of Adult Steelhead at San
Clemente Dam, RY 2005-06............... IX-16
IX-5 Adult Steelhead Counts at San Clemente Dam
(1962-2006)........................... IX-17
IX-6 Juvenile Steelhead Density -- (Selected
Years 1973-2005)............................. IX-18
IX-7 Number of Steelhead Reared Below San
Clemente Dam, 1990-2005............. IX-19
X-1 Irrigation Totals for July 2005-June 2006
Period ............................................. X-15
XI-1 Map of Monitoring Transects and Stations at
Carmel River Lagoon .................. XI-8
XI-2 Carmel River Lagoon Bathymetric Cross
Sections, 1994-2006 ........................ XI-9
U:\Darby\wp\allocation\RY
2006\final\contents.doc