2007-2008 ANNUAL REPORT

                                 MPWMD MITIGATION PROGRAM

                              WATER ALLOCATION PROGRAM EIR

 

                                                                 September 2009

 

 

                                                       TABLE OF CONTENTS

 

 

SECTION                                                                                                                         PAGE

I.                Introduction and Executive Summary................................................................... I-1

II.               Monitor Water Resources.................................................................................. II-1

III.             Manage Water Production................................................................................ III-1

IV.             Manage Water Demand.................................................................................... IV-1

V.              Monitor Water Usage........................................................................................ V-1

VI.             Augment Water Supply..................................................................................... VI-1

VII.            Allocation of New Water Supply..................................................................... VII-1

VIII.           Determine Drought Reserve............................................................................ VIII-1

IX.             Steelhead Fishery Mitigation Measures ............................................................. IX-1

X.              Riparian Habitat Mitigation Measures................................................................. X-1

XI.             Lagoon Habitat Mitigation Measures................................................................. XI-1

XII.            Aesthetic Mitigation Measures......................................................................... XII-1

XIII.           Summary of Program Costs (July 2007-June 2008)........................................ XIII-1

XIV.          References .................................................................................................... XIV-1


LIST OF FIGURES

FIGURE                                                                                                                            PAGE

II-1            San Clemente Reservoir Daily Rainfall - WY 2008 .......................................... II-15

II-2            Monthly Distribution of Rainfall at San Clemente Reservoir................................ II-16

II-3            Carmel River Basin Principal Streamflow Measuring Stations............................ II-17

II-4            Cumulative Unimpaired Runoff, Carmel River at San Clemente Dam................. II-18

II-5            End-of-Month Usable Storage for Water Resources System, WY 2008 .......... II-19

II-6            Daily Streamflow and Groundwater Elevation at Rancho Canada...................... II-20

II-7            Daily Streamflow and Groundwater Elevation at CAWD Rio North.................. II-21

II-8            Groundwater Elevations in Seaside Basin Monitoring Wells............................... II-22

II-9a/b       Water Quality in Carmel Valley Monitoring Wells............................................. II-23

II-9c/d       Water Quality in Carmel Valley Monitoring Wells............................................. II-24

II-9e          Water Quality in Two Coastal Wells in Seaside................................................. II-25

II-10          Locations of Water Temperature Measurement Stations.................................... II-26

II-11          Water Temperature Data at Carmel River Lagoon, RY 2007-08 ...................... II-27

II-12          Water Temperature Data at Garland Park Site, RY 2007-08............................ II-27

II-13          Water Temperature Data Recorded at Sleepy Hollow Weir, RY 2007-08........ II-28

II-14          Water Temperature Data Above San Clemente Dam, RY 2007-08.................. II-28

II-15          Water Temperature Data Below Los Padres Dam, RY 2007-08....................... II-29

II-16          Water Temperature Data Above Los Padres Dam, RY 2007-08...................... II-29

II-17          Carmel River Lagoon Water Surface Elevations, January 2008......................... II-30

III-1           CAW and Non-CAW Production v. MPWMD Allocation Limits...................... III-9

V-1            CAW Water Use Per Connection, 1980-2008................................................... V-5

IX-1           Streamflow at Highway 1 Bridge and Lagoon Surface Elevation....................... IX-11

IX-2           Steelhead Smolts Rescued from Carmel River Basin (1989-2008)................... IX-12

IX-3           Steelhead Rescues in Mainstem Carmel River (1989-2007)............................. IX-13

IX-4           Daily Count of Adult Steelhead at San Clemente Dam, RY 2008..................... IX-14

IX-5           Number of Steelhead at San Clemente Dam (1954-2008)............................... IX-15

IX-6           Juvenile Steelhead Population Density -- (Selected Years 1973-2007)............ IX-16

IX-7           Number of Steelhead Reared Below San Clemente Dam, 1990-2007............. IX-17

X-1            Irrigation Totals for July 2007-June 2008 Period ............................................. X-14

X-2            Thalweg Profiles, Carmel River, 1978-2007 .................................................... X-15

XI-1           Map of Monitoring Transects and Stations at Carmel River Lagoon ................ XI-10

XI-2           Carmel River Lagoon Bathymetric Cross Sections, 1994-2008 ...................... XI-11

XI-3           Carmel River Lagoon Cross Sections, Comparison of 2007-2008 Surveys...... XI-12

 

LIST OF TABLES

TABLE                                                                                                                              PAGE

I-1             Summary of Mitigation Program Components.................................................... I-15

I-2             Summary of Mitigation Program Accomplishments in 2007-2008....................... I-17

II-1            Carmel River Basin Total Annual Streamflow Summary, 1992-2008 ................ II-31

II-2            Carmel River Lagoon Water Quality Data, RY 2007-2008 .............................. II-32

II-3            Sleepy Hollow Weir Water Quality Data, RY 2007-2008................................. II-33

II-4            Below Los Padres Dam Water Quality Data, 2007-2008................................. II-34

III-1           Water Production Summary for WY 2007........................................................ III-7

III-2           Water Production Summary for WY 2008........................................................ III-8

IV-1           CAW Permits Issued by MPWMD in Fiscal Year 2007-2008.......................... IV-7

V-1            Allocation Limit vs. Water Production (WY 2007 and WY 2008)...................... V-4

VII-1         Status of Water Allocations as of June 30, 2008 ............................................. VII-2

IX-1           Juvenile Steelhead Rescued by Age and Location, RY 2007............................ IX-18

IX-2           Fish Survival at Sleepy Hollow Facility, May 2007-Jan 2008........................... IX-19

IX-3           Sleepy Hollow Facility Fish Release Location Summary................................... IX-20

IX-4           Juvenile Steelhead Population Density at Survey Stations (1990-2007)............ IX-21

IX-5           Benthic Macroinvertebrate Values at Five Carmel River Sites (Nov 2007)....... IX-22

X-1            Riparian Species Planted, July 2007-June 2008................................................ X-12

X-2            Monthly Water Use for Irrigation in RY 2007-2008......................................... X-13

XIII-1        Breakdown of Mitigation Program Costs (July 2007-June 2008)..................... XIII-2

 

U:\Darby\wp\allocation\RY 2008\final\contents_reviewdraft.doc