ITEM: |
INFORMATIONAL
ITEM/STAFF REPORT |
||||
|
|||||
19. |
MONTHLY WATER SUPPLY AND CALIFORNIA
AMERICAN WATER PRODUCTION REPORT |
||||
|
|||||
Meeting Date: |
November 18, 2024 |
Budgeted: |
N/A |
||
|
|||||
From: |
David J. Stoldt, |
Program/ |
N/A |
||
|
General Manager |
Line
Item No.: |
|||
|
|
|
|||
Prepared By: |
Jonathan Lear |
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee Recommendation: N/A |
|||||
CEQA Compliance: Exempt from
environmental review per SWRCB Order Nos. 95-10 and 2016-0016, and the
Seaside Basin Groundwater Basin adjudication decision, as amended and Section
15268 of the California Environmental Quality Act (CEQA) Guidelines, as a
ministerial project; Exempt from Section 15307, Actions by Regulatory
Agencies for Protection of Natural Resources. |
|||||
Exhibit 19-A shows the water supply status for the Monterey Peninsula Water Resources System (MPWRS) as of November 1, 2024. This system includes the surface water resources in the Carmel River Basin, the groundwater resources in the Carmel Valley Alluvial Aquifer and the Seaside Groundwater Basin. Exhibit 19-A is for Water Year (WY) 2025 and focuses on three factors: rainfall, runoff, and storage. The rainfall and Streamflow values are based on measurements in the upper Carmel River Basin at Sleepy Hollow Weir.
Water Supply Status: Rainfall through October 2024 totaled 0.00 inches and brings the cumulative rainfall total for WY 2025 to 0.00 inches, which is 0% of the long-term average through October. Estimated unimpaired runoff through October totaled 576 acre-feet (AF)
and brings the cumulative runoff total for WY 2025 to 576 AF, which is 142% of the long-term average through October. Usable storage for the MRWPRS was 28,140 acre-feet, which is 102% of average through October, and equates to 85% percent of system capacity.
Production Compliance: Under State Water Resources Control Board (SWRCB) Cease and Desist Order No. 2016-0016 (CDO), California American Water (Cal-Am) is allowed to produce no more than 3,376 AF of water from the Carmel River in WY 2025. Through October, using the CDO accounting method, Cal-Am has produced 296 AF from the Carmel River (excluding 0 AF of Table 13 and 0 AF of Mal Paso.) In addition, under the Seaside Basin Decision, Cal-Am is allowed to produce 1,474 AF of water from the Coastal Subareas and 0 AF from the Laguna Seca Subarea of the Seaside Basin in WY 2024. Through October, Cal-Am has produced 250 AF from the Seaside Groundwater Basin. Through October, 0 AF of Carmel River Basin groundwater have been diverted for Seaside Basin injection; 0 AF have been recovered for customer use, 0 AF have been diverted under Table 13 water rights, and 270 AF of Pure Water Monterey recovered. Cal-Am has 852 AF for customer use from all sources through October. Exhibit 19-B shows production by source. Some of the values in this report may be revised in the future as Cal-Am finalizes their production values and monitoring data.
EXHIBITS
19-A Water Supply Status: November
1, 2024
19-B Monthly Cal-Am production by source: WY 2025
U:\staff\Boardpacket\2024\11182024\Informational
Items\19\Item-19.docx