ITEM: |
PUBLIC HEARINGS |
||||
|
|||||
20. |
CONSIDER ADOPTION OF JULY
THROUGH SEPTEMBER 2006 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
June 22, 2006 |
Budgeted: |
N/A |
||
|
|||||
From: |
David A. Berger, |
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
Darby Fuerst/ |
Cost Estimate: |
N/A |
||
|
Dave Dettman |
|
|
||
|
|||||
General Counsel Approval: N/A |
|||||
Committee
Recommendation: N/A |
|||||
Committee Recommendation: Notice
of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA
Compliance: Consistent with the
September 2001 Conservation Agreement between the National Marine Fisheries
Service and California-American Water to minimize take of listed steelhead in
the Carmel River, Consistent with SWRCB WR Order Nos. 95-10, 98-04, 2002-0002 |
|||||
SUMMARY: The Board will accept public comment and
take action on the July through September 2006 Water Supply Strategy and Budget
for the California American Water (Cal-Am) Water Distribution System
(WDS). The proposed budget, Exhibit 20-A, is based on “wet year” inflow
conditions for the remainder of the Water Year 2006 (WY 2006). Specifically, the budget utilizes monthly
inflows that are exceeded about 12-25% percent of the time at San Clemente Dam.
The proposed strategy and budget is designed to maximize the long-term
production potential and protect the environmental quality of the
Exhibit 20-A shows the anticipated production by
Cal-Am for each production source. Exhibit 20-A also shows actual production
values for the water year to date. Please
note that the anticipated production values shown assume an annual Cal-Am
production not exceeding 14,789 AF, including 3,504 AF from the
For the first
eight months of Water Year 2006, Cal-Am’s production is well below the
SWRCB-based overall production target by 863
acre-feet or 9.8 %. In addition, with the proposed water
production during this quarter, the total WY 2006 projected production from the
Cal-Am Seaside wells is approximately 3,504 acre-feet, which is equivalent to
Cal-Am’s annual allocation for adjudicated water rights from the Seaside
Coastal Basin under Judge Randall’s Decision in Cal-Am vs. City of
For the
purpose of this budget it is assumed that no water from the Carmel River Basin
will be injected into the Seaside Basin during the July through September 2006
period.
RECOMMENDATION: The Board should receive public input,
close the Public Hearing, and discuss the proposed water supply budget. District staff recommends adoption of the
proposed budget. The budget is described
in greater detail in Exhibit 20-B,
Quarterly Water Supply Strategy Report: July – September 2006.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production
within the Cal-Am Water Distribution System for the three-month period of July,
August and September 2006. This strategy
was developed cooperatively with staff from the District, Cal-Am, and the National
Marine Fisheries Service (NMFS).[1] Based on the fact that San Clemente and Los
Padres Reservoirs are full, spilling and streamflow at the Don Juan gaging
station is expected to remain above 20 cubic feet per second (cfs) until
mid-July, it was agreed that Cal-Am could divert from its wells in Carmel
Valley Aquifer Subunit 2 until July 15, or until streamflow declined below 20
cfs, whichever occurs sooner. For the remainder of July, August, and September 2006,
Cal-Am would not divert any water from San Clemente Dam through the Carmel
Valley Filter Plant, except in the case of emergency conditions. This limitation is consistent with the 4d
rules adopted by the NMFS to protect aquatic habitat and with the Conservation
Agreement (CA) between NMFS and Cal-Am, which governs diversions during
low-flow periods.[2] For purposes of the CA, the low-flow periods
are defined as times when streamflow in the
The
proposed budget allows Cal-Am to divert a maximum of 0.5 cfs/day (31 AF/month)
from its sources upstream of and including Scarlett Well No. 8. This operation takes into account limitations
imposed by Cal-Am’s Interim Drawdown Project at San Clemente Dam and the 2001
Conservation Agreement with the NMFS.
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
EXHIBITS
20-A Quarterly
Water Supply Strategy and Budget: July-September 2006
20-B Quarterly
Water Supply Strategy and Budget Report
U:\staff\word\boardpacket\2006\2006boardpackets\20060622\PubHrgs\20\item20.doc
[1] Normally, the California Department of Fish and Game participates in development of each quarterly water supply budget, but due to conflicting schedules they were unable to attend the meeting on June 6, 2006.
[2] Under the 4d rules adopted by the National Marine Fisheries Service on July 10, 2000, the Take Guidance Section, Item E. (page 42472 of the FR Vol. 65, No 132) prohibits removing water or altering streamflow when it significantly impairs spawning, migration, feeding or other essential behavioral patterns.