ITEM: |
PUBLIC HEARINGS |
||||
|
|||||
19. |
CONSIDER ADOPTION
OF APRIL THROUGH JUNE 2011 QUARTERLY WATER SUPPLY STRATEGY AND BUDGET |
||||
|
|||||
Meeting Date: |
March 21, 2011 |
Budgeted: |
N/A |
||
|
|||||
From: |
|
Program/ |
N/A |
||
|
General Manager |
Line Item No.: |
|||
|
|||||
Prepared By: |
|
Cost Estimate: |
N/A |
||
|
|||||
General Counsel Review: N/A |
|||||
Committee
Recommendation: N/A |
|||||
CEQA
Compliance: Notice of Exemption, CEQA, Article 19, Section 15301 (Class 1) |
|||||
ESA Compliance:
Consistent with the 2001 Conservation Agreement, 2009 Settlement
Agreement between the National Marine Fisheries Service and California
American Water to minimize take of listed steelhead
in the Carmel River, and SWRCB WR Order Nos. 95-10, 98-04, 2002-0002, and
2009-0060. |
|||||
SUMMARY:
The Board will accept public comment and take action on the April
through June 2011 Quarterly Water Supply Strategy and Budget for California
American Water’s (CAW) Main and Laguna Seca Subarea Water Distribution Systems
(WDS). The proposed budgets, which are
included as Exhibit 19-A and 19-B, show monthly production by source of
supply that is required to meet projected customer demand in CAW’s Main and
Laguna Seca Subarea systems, i.e., Ryan
Ranch, Bishop, and Hidden Hills, during the April through June 2011 period. The proposed strategy and budgets are
designed to maximize the long-term production potential and protect the
environmental quality of the Seaside Groundwater and
Exhibit 19-A shows the anticipated production
by CAW’s Main system for each production source and the actual production
values for the Water Year (WY) 2011 to date through the end of February
2011. The anticipated production values
assume that CAW annual main system production for customer service will not
exceed 13,631 acre-feet (AF), including 3,202 AF from CAW’s wells in the
Coastal Subareas of the Seaside Groundwater Basin, 300 AF from Sand City
Desalination Plant, 1,111 AF from Water Project 1 (formerly Phase 1 ASR), and
9,018 AF from the Carmel River Basin.
The total from the
Exhibit 19-B shows the anticipated production
by CAW’s Laguna Seca Subarea system for each production source and the actual
production values for the WY to date through the end of February 2011. Please note that the budgeted production
values assume that CAW’s annual Laguna Seca Subarea systems’ production for WY
2011 will not exceed 246 AF from the Laguna Seca Subarea of the Seaside
Groundwater Basin, whereas actual demand will exceed that amount. This total is consistent with the
If
stream flow in the Carmel River exceeds the instream flow requirements
specified by National Marine Fisheries Service (NMFS), a portion of the “excess”
water may be diverted by CAW for injection into the Seaside Groundwater Basin
as part of Water Project 1. The amount
of water diverted from the
RECOMMENDATION:
The Board should receive public input, close the Public Hearing, and
discuss the proposed quarterly water supply budget. District staff recommends adoption of the proposed
budget. The budgets are described in
greater detail in Exhibit 19-C,
Quarterly Water Supply Strategy Report: April – June 2011.
BACKGROUND:
The Quarterly Water Supply Strategy and Budget pertains to production within
CAW’s Main and Laguna Seca Subarea systems for the three-month period of April,
May, and June 2011. Staff from the
District, CAW, and California Department of Fish and Game (CDFG), cooperatively
developed this strategy on March 8, 2011.
Based on current reservoir and Carmel Alluvial Aquifer storage
conditions, river flows in October 2010 through February 2011, it was agreed
that “normal” year inflows would be used to conservatively assess CAW’s
operations and set monthly production targets for CAW’s systems.
To
meet customer demand in its main system, CAW intends to try to avoid producing
any groundwater from its wells in the Upper Carmel Valley during April through
June 2011, and will focus instead on producing approximately 832, 769, and 855
AF of groundwater from its wells in the Lower Carmel Valley during April, May,
and June 2011, respectively. Of this
production, it is assumed that 281 AF would be diverted from the Carmel River
and injected for storage into the Seaside Groundwater Basin during April
2011.
It
was also agreed that, subject to rainfall and runoff conditions in the Carmel
River Basin, CAW would produce 450, 500, and 500 AF of water in April, May and
June 2011, respectively, from the Coastal Subareas of the Seaside Basin, in addition
to 25 AF per month from the Sand City Desalination Plant during this
period. It was also agreed that CAW
would budget to produce 17, 24, and 28 AF of groundwater from its wells in the
Laguna Seca Subarea for its customers in the Ryan Ranch, Bishop, and Hidden
Hills systems during this period.
Lastly, it was agreed that CAW would not divert any water from San
Clemente Reservoir through the Carmel Valley Filter Plant during this quarter. CAW will operate its wells in the
Rule
101, Section B of the District Rules and Regulations requires that a Public
Hearing be held at the time of determination of the District water supply
management strategy. Notice of this
Public Hearing has been published in The Herald. Adoption of the quarterly water supply
strategy and budget is categorically exempt from the California Environmental
Quality Act (CEQA) requirements as per Article 19, Section 15301 (Class
1). A Notice of Exemption will be filed
with the Monterey County Clerk's office, pending Board action on this item.
EXHIBITS
19-A Quarterly Water Supply Strategy
and Budget for CAW Main System: April - June 2011
19-B Quarterly Water Supply Strategy
and Budget for CAW Laguna Seca Subarea: April - June 2011
19-C Quarterly Water Supply Strategy and Budget
Report: April - June 2011
U:\staff\word\boardpacket\2011\20110321\PubHrg\19\item19.docx